Quality control
Incoming inspection of components
All purchased components undergo mandatory incoming inspection before entering production. We check:
- compliance of items and ratings with the order specification
- supplier certificates and permits
- absence of mechanical damage and defects
- functionality through incoming testing
Base configurations use IEK, EKF and TDM components. On request we install ABB, DKC, Systeme Electric, Schneider Electric and other brands.
In-process assembly control
Assembly is controlled at every stage — before the unit is closed we verify:
- installation and reliability of electrical connections
- compliance of the wiring with the electrical diagram
- marking of conductors and devices
- final functional and visual inspection
Acceptance testing
Every unit passes acceptance tests before shipment:
- electrical safety check
- insulation resistance measurement
- dielectric strength test
- temperature-rise check at rated load
- confirmation of IP44/IP54 protection degree
The results are recorded in a test report supplied to the customer together with the unit.
Documentation and compliance
Every System Power unit is supplied with a document package:
- certificate of conformity
- product passport
- EAEU declaration
- test report
The documents confirm compliance with GOST R 51321, PUE (chapter 7.1) and TR CU 004/2011 “On the safety of low-voltage equipment”.
ISO standards
- ISO 9001 Quality management system
- ISO 14001 Environmental management system
Technical regulation
Documents
EAEU Certificate of Conformity No. RU C-RU.МЛ10.В.00632/24
Low-voltage switchgear and controlgear assemblies. TR CU 004/2011, GOST R 51321.1-2007, GOST IEC 61439-1, GOST IEC 61439-2. Manufacturer — Sistemnye Resheniya LLC. Valid 18.11.2024 – 17.11.2029.
Download PDF (1 МБ)